Search results

Amtrak Unlimited Discussion Forum

Help Support Amtrak Unlimited Discussion Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. P

    New train travel enthusiast!

    The best of the Zephyr westbound is day 2, after you leave Denver....Really amazing country
  2. P

    Transitdocs status map down?

    just hit the dite ok on this pc
  3. P

    Fall trip, cross country flights and California Rail, Sept. 2024

    might be my niece, she was buying for a Cental Market (upscale HEB chain) and moved to an HEB regional position (still in Austin)
  4. P

    Empire Builder discussion 2023 Q4 - 2024

    probably varies widely by both the model of locomotive, and point of impact of the tree
  5. P

    MNRR Dual Mode Chargers discussion

    I'm basing my numbers on the published specs
  6. P

    My USA trip 2024 (part 1)

    Spirit is considered by many to be the lowest ranked mainline carrier. They are operating under bankruptcy protection and their long term survival is questionable.
  7. P

    MNRR Dual Mode Chargers discussion

    If I recall correctly, 80 mph operation on 3rd rail power is possible, which would be consistent with the M-7 EMU operation.
  8. P

    East River Tunnels rehabilitation 2024-2027

    The trains go through the tunnels to Sunnyside where they loop and come back in, they are not double ended. That's part of the traffic they want to reduce. What is the set 245 uses run as in the other direction? That might be where the extra car will be useful.
  9. P

    Gimbals for Smartphones

    B&H Photo has a wide selection ranging from very basic to high end. good place to start research https://www.bhphotovideo.com/c/search?Ntt=smartphone%20gimbal&N=0&InitialSearch=yes&sts=ps
  10. P

    East River Tunnels rehabilitation 2024-2027

    the additional car will be helpful as well
  11. P

    East River Tunnels rehabilitation 2024-2027

    Today it was announced that some changes are being made temporarily to the original plan, and it involves adding a car to a number of trains and restoring the ADK/leaf and reinstating 235/238. They will reevaluate in March.
  12. P

    Austin to Store New Electric Buses for 1 Year

    The ability to do some charging while on the road greatly increase range. It is a feature I've seen offered on NOVA and New Flyer as well. The charging systems are brand agnostic, which is critical for real world application.
  13. P

    Amtrak Dining and Cafe Service discussion 2024 H2

    Keurig pods are very expensive per serving compared to other methods, and are very prone to theft. Current pods are now recyclable, but in the Amtrak environment they wouldn't be.
  14. P

    My USA trip 2024 (part 1)

    Thank you for your wonderful narrative, hoping you enjoy the rest of the journey. I too enjoy the Chicago architecture scene and aside from the walking have taken an architecture focused river boat tour. My sister used to live in Santa Monica, those pictures brought back some memories.
  15. P

    Austin to Store New Electric Buses for 1 Year

    I believe those are Yutong, I don't think they are sold in the US. BYD which is also Chinese opened a factory in the US, and has gotten some decent orders, including LA
  16. P

    East River Tunnels rehabilitation 2024-2027

    There are 4 tubes, only 2 were heavily damaged by Sandy. I think they are doing 1 and then 2 but I might have that wrong. While the work is ongoing, one tube will be completely shut and operations will be on the other 3.
  17. P

    Superliner trains' removal and restoration of cars 2024

    How much VL is Hialeah rather than BG?
  18. P

    Austin to Store New Electric Buses for 1 Year

    Didn't Philly have issues with Proterra?
  19. P

    Austin to Store New Electric Buses for 1 Year

    When you buy from a company without a long-term track record you roll the dice. Lack of charging equipment is just poor planning. If you bought 50 diesel buses and didn't have fuel pumps at the depot it would be the same thing. If they had gone Nova or New Flyer this would not be happening.
  20. P

    East River Tunnels rehabilitation 2024-2027

    I'm pretty sure Albany was extended, that looks like the original number. There was a major project adding the fourth track and lengthening at least one of the platforms. I don't remember if they did both. The whole Lake pulls in and is joined/split with the Boston section
Back
Top