    MNRR Dual Mode Chargers discussion

    roof exit is a FRA mandate but on dual modes there will be a modification to fireman's side window. egress is over console and a rope type ladder down to coupler level . note: that picture in my post is not actual Metro North unit but a photoshop. the trucks lack third rail gear and fireman's...
  2. D

    MNRR Dual Mode Chargers discussion

    Reason third rail operations is expanded is that new Dual modes have a energy storage module that will keep HEP alive in gaps. so HVAC's do not get damaged. the P32acdm's did not have an option for that. The module does not power locomotive in gaps.
  3. D

    Acela 21 (Avelia Liberty) development, testing and deployment

    not sure, report is from New Generation Equipment Committee.
  4. D

    MNRR Dual Mode Chargers discussion

    #301 just about ready for testing. https://ngec.org/wp-content/uploads/2024/03/305-activities-report-monthly-2-29-24.pdf photoshop picture only for reference :
  5. D

    Acela 21 (Avelia Liberty) development, testing and deployment

    from NEGR site : Amtrak Equipment Procurement Update as of 2-29-24: On the Acela: Staging and testing continues – they are about halfway through Stage 1 and are optimistic that it can be wrapped up in a month or two and move on to stage 2.On the Airo trainset: Progress is strong – there are 34...
  6. D

    Budd RDC technical stuff

    now your getting confusing , transition has nothing to do with gears or shifting, its reconfiguring the electric circuit to traction motors. Series - parallel - and field shunting , the mechanical configuration does not change.
  7. D

    Budd RDC technical stuff

    not sure were you got that drawing but here is picture of real RDC throttle
  8. D

    Budd RDC technical stuff

    Having worked and ran both RDC and SPV as Electrician/ MofE foreman/Engineer . no source from outside.
  9. D

    Budd RDC technical stuff

    The RDC only had 4 trottle settings no control of gears it had TC (transmission/clutch)and 1- 2 -3 as trottle settings accomplished by 3 throttle solenoids on engine. the SPV had a stepless air trottle controlling engine speed between 90 and 110 lbs of brake pipe pressure, the transmission was...
  10. D

    MNRR Dual Mode Chargers discussion

    latest on Metro North Dual mode chargers. https://ngec.org/wp-content/uploads/2024/02/Metro-North-Railroad-Siemens-NGEC-2024-PPT.pdf?fbclid=IwAR1xqwzmhHGN2GOwQFxI4lbHA8wBRoeSeMuIEvfwm4vCJ4H1UhhEhr5yJqM
  11. D

    Long Distance (LD) fleet replacement discussion (2022 - 2024Q1)

    120" is not interior wide, but car width I believe, distract about 5 inches on each side for insulation and wall panels.
  12. D

    New York City Subway derailment 1/4/24

    statements from MTA now is out of service train did NOT have a favorable signal. the Revenue train did have a green signal
  13. D

    New York City Subway derailment 1/4/24

    find it odd that no one has mentioned that unless one train ran a stop signal, it could only mean a faulty track circuit. as has happened at Marble hill a long time ago on Metro North
  14. D

    E and F unit locomotives today

    streamlining is mainly aesthetics, the most drag is actually the space between cars where they are coupled.
  15. D

    E and F unit locomotives today

    When restoring a locomotive it is usually grandfathered to rules that existed during initial construction. A new locomotive is subject to rules at time of construction. same with pollution standards a locomotive is subject to standards at time Engine(motor) was constructed. So an upgraded F...
  16. D

    Connecticut DOT new car order for Alstom

    the dual modes don't run of catenary wire.
  17. D

    Connecticut DOT new car order for Alstom

    No electrification plans and cars are not meant for Metro North pool service so will not see third rail territory
  18. D

    Acela 21 (Avelia Liberty) development, testing and deployment

    Remember how Alstom rescinded the test running and offer for 6 axle CC21003 (French fry) X-996 mainly due to track conditions on N.E.C. http://www.amtrakhistoricalsociety.org/x996.html
  19. D

    Acela 21 (Avelia Liberty) development, testing and deployment

    Alstom the problem ?? lets just list all suppliers Amtrak has problems with, now- in past - in future. there is only one common denominator in all this. as for Alstom absorbing Bombardier ? yes Bombardier has had some poor workmanship issues but how much or how many people ended up in Avelia...