The only thing I would add is that the power in Watts drawn for each voltage should be the same, although the efficiency of the transformer at 25Hz vs. 60Hz may be different this affecting power draw slightly. However the lower voltage means almost twice the amps drawn through the pantograph which might be an issue along with the variable tension catenary not providing as uniform a contact surface. I am not an EE so take my comments with a large grain of salt.
That is a very hefty assumption. Usually power drawn is regulated based on the design voltage of the territory in order to keep things from overheating in lower voltage territories due to the consequent higher current draw. That is why total available power for lower voltage catenary is less and operational characteristics are degraded to some extent. The question is to what extent such regulation is in effect for 12.5kV vs. 25kV. I don't know the answer to that.

Another thing that is visible in the catenary in 12.5kV segment is the additional Messenger Wire in the catenary which is needed to deliver the higher current efficiently, sometimes with a heavier contact wire which requires more support. They are usually absent in 25kV electrification except in extremely heavy duty freight lines.
 
Last edited:

west point

Engineer
Joined
Jun 9, 2015
Messages
3,472
Location
SW ATL airport
Speculation: Once Amtrak has 4 fully approved AX-2s it might launch a soft inauguration of service this fall. Have 2 in NYP and 2 in WASH. The AX-1 trips they would replace can remain standby along with the -2s that might be down for some reason. It might require some reservation tweaks to prevent overbookings. However, this speculation ignores what about BOS. I have not heard that an AX=2 has visited BOS for training but vaguely think it has visited.
 
Last edited:
Joined
Jan 9, 2021
Messages
800
Location
Boston
Speculation: Once Amtrak has 4 fully approved AX-2s it might launch a soft inauguration of service this fall. Have 2 in NYP and 2 in WASH. The AX-1 trips they would replace can remain standby along with the -2s that might be down for some reason. It might require some reservation tweaks to prevent overbookings. However, this speculation ignores what about BOS. I have not heard that an AX=2 has visited BOS for training but vaguely think it has visited.
They have visited Boston last year and recently, so it’s possible.
 

Acela150

Super Buff
Joined
Jan 11, 2008
Messages
9,052
Location
Somewhere between here and there
Speculation: Once Amtrak has 4 fully approved AX-2s it might launch a soft inauguration of service this fall. Have 2 in NYP and 2 in WASH.

The chances of this are astronomically low. The new trainsets aren't approved for speeds over 90mph except when testing, also of note Amtrak is planning to do cant deficiency testing this fall.

Sorry to be the buzz kill.
 

jis

Chief Dispatcher
Staff member
Administator
Moderator
Gathering Team Member
Joined
Aug 24, 2003
Messages
32,766
Location
Space Coast, Florida, Area code 3-2-1
The chances of this are astronomically low. The new trainsets aren't approved for speeds over 90mph except when testing, also of note Amtrak is planning to do cant deficiency testing this fall.

Sorry to be the buzz kill.
I was about to mention this, but you beat me to it.

The cant deficiency work will actually determine what the new speed limits will be for these sets on many of the curves.
 

west point

Engineer
Joined
Jun 9, 2015
Messages
3,472
Location
SW ATL airport
Note: I did say fully approved. If the testing is behind schedule ( which almost always happens) of course it will be later. So Once they are fully approved maybe Amtrak will have a soft inaguration.
 

jis

Chief Dispatcher
Staff member
Administator
Moderator
Gathering Team Member
Joined
Aug 24, 2003
Messages
32,766
Location
Space Coast, Florida, Area code 3-2-1
Expecting revenue service anytime before FY2023 Q4 is basically living in Fantasyland, to those who are ‘speculating’
I have been trying to say that whenever these speculations come up. But some people are just incorrigible optimists.
 