Temporary service changes between ALB and SDY (July-August 2022)

Amtrak Unlimited Discussion Forum

Help Support Amtrak Unlimited Discussion Forum:

MontanaJim

Service Attendant
Joined
Nov 14, 2011
Messages
150
well you can ride and see what happens! I was on board 290 out of BTN on Friday. Was a great ride, though of course would have been better without bussing. Oh well.
 

joelkfla

Engineer
Joined
Oct 16, 2018
Messages
2,171
Location
12 miles from Walt Disney World
This situation may take a long time to resolve. The building owner is quite litigious and will oppose any attempt by the city to demolish the structure. And he doesn't seem to have the assets or the inclination to fix the building either.
The mayor or some similar official was interviewed on one of the news clips. She said their hands were tied before, but now that it's an imminent public safety hazard, they can do what's necessary and bill the owner.
 

zephyr17

Engineer
Joined
Jul 23, 2009
Messages
6,234
Location
Washington State
The mayor or some similar official was interviewed on one of the news clips. She said their hands were tied before, but now that it's an imminent public safety hazard, they can do what's necessary and bill the owner.
Yeah, I saw that, too. Cities and counties have pretty extensive rights when something is clearly hazardous.

I think that owner is going to come out on the short end of the stick. At the end of all this I think it is likely he'll lose that property entirely, seized for unpaid taxes and repair/demolition bills, which he won't pay, either.
 
Joined
May 1, 2017
Messages
769
Location
Pittsburgh, Pa.
Yeah, I saw that, too. Cities and counties have pretty extensive rights when something is clearly hazardous.

I think that owner is going to come out on the short end of the stick. At the end of all this I think it is likely he'll lose that property entirely, seized for unpaid taxes and repair/demolition bills, which he won't pay, either.

He likely will, but he can also tie it up in courts and drag this drama out and make it tough on everybody. He doesn't strike one as the compromising type.
 

zephyr17

Engineer
Joined
Jul 23, 2009
Messages
6,234
Location
Washington State
He likely will, but he can also tie it up in courts and drag this drama out and make it tough on everybody. He doesn't strike one as the compromising type.
He can tie up the bills in courts but with an imminent hazard, he can't really tie up evaluation and repair or demolition. His lawyers can try, but it isn't likely a court is going to stay a city from remediating a clearly imminent hazard to the public safety. It may be years before it is all sorted out legally, and Albany isn't going to get reimbursed any time soon (if ever), but all that will be after the fact. The city will be able to take action since the building is now shedding large chunks of concrete (which it wasn't before, or not noticeably).

Too bad he preferred to pay lawyers instead of contractors up to now.
 

west point

Engineer
Joined
Jun 9, 2015
Messages
3,578
Location
SW ATL airport
The pictures reveal tht the problem is worse than I thought. Early reports seemed to indicate that only the facade falling off. That building is one as a business would never rent space. Just trying to keep employees would be impossible.
 

billosborn

Train Attendant
Joined
Mar 6, 2022
Messages
55
Looks like the LSL 49(31) successfully completed it's bus bridge in Albany. It departed from Schenectady over two hours late, but that makes sense - it many only be about 20 minutes from the two cities, but you have off load everyone from the train at Albany, put them and their luggage on to buses, and then reload everyone and everything to the other LSL at Schenectady.
Since there seems to be no quick fix for the crumbling building, I would assume that the delay ot of Schenectady will continue.

I am booked on the LSL 49 on August 27 from Buffalo. So instead of getting on at 12.43 am at Depew, we get to wait around another few hours in the station...:) We have a roomette, so we can crawl into bed, skip breakfast, and hope that it's late enough into Chicago to sneak in lunch!
 

jis

Chief Dispatcher
Staff member
Administator
Moderator
AU Supporting Member
Gathering Team Member
Joined
Aug 24, 2003
Messages
33,141
Location
Space Coast, Florida, Area code 3-2-1
So the Amtrak qualification runs have taken place yesterday, and there will be more before the detour is put into effect.

Rumor has it that Amtrak trains will make SDY and then proceed to South Schenectady Yard from where it will reverse on the Carmen Branch to the Selkirk Branch, then move forward on it to the Post Road Junction and reverse from there into ALB. It will probably add a couple of hours to the overall time between ALB and SDY, but probably less than the time taken by the bus bridge. And of course it will be a more convenient single seat ride.
 

Amtrak25

Lead Service Attendant
AU Supporting Member
Joined
Dec 7, 2021
Messages
403
Location
New Jersey
In Sunday, I tracked 290. It was 10 minutes late into Saratoga, and makeup train was 20 late out of Rensselaer.

I am 290 right now. We left Burlington 10 minutes late. 26 passengers boarded there.

The latst time I departed Burlington on a train was July 1976 for Rutland on board former LIRR P54 coaches of Steamtown's.
 

jis

Chief Dispatcher
Staff member
Administator
Moderator
AU Supporting Member
Gathering Team Member
Joined
Aug 24, 2003
Messages
33,141
Location
Space Coast, Florida, Area code 3-2-1
In Sunday, I tracked 290. It was 10 minutes late into Saratoga, and makeup train was 20 late out of Rensselaer.

I am 290 right now. We left Burlington 10 minutes late. 26 passengers boarded there.

The latst time I departed Burlington on a train was July 1976 for Rutland on board former LIRR P54 coaches of Steamtown's.
If the bus bridge is that quick maybe they should continue with the bus bridge for the EA and use the complex diversion only for the LSL and ML.
 

John819

Service Attendant
AU Supporting Member
Joined
Aug 29, 2021
Messages
106
Location
New York
So the Amtrak qualification runs have taken place yesterday, and there will be more before the detour is put into effect.

Rumor has it that Amtrak trains will make SDY and then proceed to South Schenectady Yard from where it will reverse on the Carmen Branch to the Selkirk Branch, then move forward on it to the Post Road Junction and reverse from there into ALB. It will probably add a couple of hours to the overall time between ALB and SDY, but probably less than the time taken by the bus bridge. And of course it will be a more convenient single seat ride.
I guess a good portion of the run will be at restricted speed, correct?
 

jis

Chief Dispatcher
Staff member
Administator
Moderator
AU Supporting Member
Gathering Team Member
Joined
Aug 24, 2003
Messages
33,141
Location
Space Coast, Florida, Area code 3-2-1
I guess a good portion of the run will be at restricted speed, correct?
Yes. And clearly the bus bridge will be quicker than the diversion for Regional trains. So the diversion might make sense only for the LSL and perhaps the ML. We'll have to wait and see how this unfolds.
 

PRR 60

Engineer
AU Supporting Member
Gathering Team Member
Joined
Feb 18, 2003
Messages
8,468
Yes. And clearly the bus bridge will be quicker than the diversion for Regional trains. So the diversion might make sense only for the LSL and perhaps the ML. We'll have to wait and see how this unfolds.
I did a topomap distance of the proposed diversion route and came up with just over 47 miles station to station between Schenectady (SDY) to Albany (ALB). At 30mph that would be about 90 minutes running time. Add 10 minutes each for the three changes in direction, we're up to two hours. Add another hour of slop because it is Amtrak and CSX (imprecision railroading), and we're up to three hours from leaving SDY to arriving at ALB, and vice versa. The normal route SDY - ALB is 18 miles and is scheduled at 27 minutes. My guess: 2 to 2-1/2 hours delay using the diversion route. However, rare mileage is worth something. 😁
 

Amtrak25

Lead Service Attendant
AU Supporting Member
Joined
Dec 7, 2021
Messages
403
Location
New Jersey
I took the VTL bus northbound on Friday. It lost a half hour north of Rutland with US7 congestion and repaving.
Train 290 got to Saratoga on time.
Transfer time to 3 Wade Tour buses took 13 minutes. We bypassed Schenectady, arrived Rensselaer exactly on time. Relief train departed 3 minutes late.

Entire 48/448 consist is sitting there pointed south. I have no ideas how or when it got there.

There was another Ethan Allen consist sitting in Saratoga ready to be 291. Our 290 conductor from Burlington rode the bus with us. I have no idea how or when the northern Ethan Allen consists get to or from Saratoga.

Word on bus is that tracks open on Tuesday regardless of that building. When we drove by it on the bus on the highway, there was no sign of activity
 

PRR 60

Engineer
AU Supporting Member
Gathering Team Member
Joined
Feb 18, 2003
Messages
8,468
Assuming my route assumptions are correct, this is what the diversion looks like. First image is the detail in the Schenectady area, second is the full route.SDY Area.jpg SDY-ALB.jpg
 