VIA train collides with Ottawa transit bus

Amtrak Unlimited Discussion Forum

Help Support Amtrak Unlimited Discussion Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Off hand does anyone have information on Train 51; I'm not familiar with most of the VIA stuff but get the impression this is a short haul along the lines of an Amtrak Regional or Illinois Service.
 
Train 51 is the 6:20am departure out of Montreal Central arriving in Fallowfield (Ottawa) at 8:48am, departing Fallowfield (Ottawa) at 8:52am arriving Toronto Union Station at 12:49pm
 
Last edited by a moderator:
Train 51 is the 6:20am departure out of Montreal Central arriving in Fallowfield (Ottawa) at 8:48am, departing Fallowfield (Ottawa) at 8:52am arriving Toronto Union Station at 12:49pm
In that respect it's something of an oddity, as its one of the slower Montréal / Toronto trains that goes via Ottawa. Passengers originating in Montréal can leave 25 minutes later on train #53 and arrive about an hour earlier at stations between Kingston and Toronto.
 
I read that people were yelling at the bus driver to stop. How terrifying and horrible. :(

I also feel bad for the first responders who have to deal with that scene.

This is simply awful.
 
Train 51 is the 6:20am departure out of Montreal Central arriving in Fallowfield (Ottawa) at 8:48am, departing Fallowfield (Ottawa) at 8:52am arriving Toronto Union Station at 12:49pm
In that respect it's something of an oddity, as its one of the slower Montréal / Toronto trains that goes via Ottawa. Passengers originating in Montréal can leave 25 minutes later on train #53 and arrive about an hour earlier at stations between Kingston and Toronto.
I understand the purpose of that train is mostly for travel between Montreal and Ottawa, and Ottawa and Toronto, and not Montreal to Toronto.
 
Rail crossing where deadly crash occurred was identified as ‘severe’ safety issue a decade ago


OTTAWA — The Barrhaven rail crossing where an OC Transpo double-decker bus and a Via passenger train collided Wednesday morning, killing at least six people, has been on the radar as a “severe public safety issue” for more than a decade.



In the early 2000s the city had a plan to build an underpass for Woodroffe Avenue and the then-yet-to-be-built Transitway next to it, to separate traffic from the trains.

In 2002, Ottawa’s then-mayor Bob Chiarelli described the intersection of tracks and road as “a very, very severe public safety issue.”

At the time, there weren’t even signals at the crossing, which was built when south Nepean was lightly populated. The city wanted to widen Woodroffe, add the Transitway next to it, and put them both in an underpass to keep them away from the tracks.

The $40-million project, whose cost was to be split among the city, provincial and federal governments, was put on hold in 2003 when it turned out that an unusual kind of rock in the area let water flow too freely into the construction trench.

The problem could be solved, city officials said at the time, but it would have cost more money; city council would have had to vote to spend it in 2004 and the other governments would have had to be asked to kick in, too.

When a new estimate for the cost of two underpasses (including one at a nearby crossing of Fallowfield Road) came in at $111 million, the city abandoned the idea in favour of adding signals to the crossings.

CN Rail, which owned the track, had previously rejected that as inadequate — the idea had been examined by more than one “environmental study report,” processes that found problems with all the alternatives, including overpasses....

In the end, though, everyone agreed that spending $10 million on signals at the two crossings was the best solution. The city report said that the “exorbitant” cost of the underpasses was a factor, along with the fact that the then-new Via station at Fallowfield had led to trains crossing Woodroffe at much lower speeds. Minutes from a 2004 meeting have Coun. Jan Harder, who still represents the area, praising the creativity of the city’s staff in convincing CN that a wider Woodroffe, with an adjacent Transitway extension, would be OK with a crossing and signal....

According to David Jeanes, president of the advocacy group Transport Action Canada, the Via train involved in Wednesday’s crash was allowed to travel at speeds as high as 160 km/h, although it is highly unlikely that the train was moving that fast.
For one thing, said Jeanes, the train would have been preparing to stop at the Fallowfield station, which is located just west of the crash scene, and should have been slowing down.

In addition, if it had been travelling at high speeds, the train would have been thrown much farther after the collision than it was.

After it was decided that an underpass for vehicular traffic was not feasible, Transport Canada gave approval for “full quadrant gates,” which Jeanes described as large barriers that block all lanes of traffic — both on Woodroffe Avenue and on the adjacent Transitway — that would not allow cars or buses to sneak around the barriers.

It remains unclear why Wednesday’s crash occurred, but eyewitness reports suggest the OC Transpo bus did not stop before colliding with the train....
 
The driver either had a medical condtion, was binded by sun rays, or suffered a brake failure. The train involded was a GE P42DC hauling LRC railcars. The bus involved was an Alexander Dennis Enviro 500. Double-deck buses have appeard to be more prone to brake failures than single-deckers.

Better mechanics, more reliable buses, and well trained drivers are possible solutions to this problem.

Bless all the deceased. RIP.
 