Amtrak 98 12/27

Amtrak Unlimited Discussion Forum

Help Support Amtrak Unlimited Discussion Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Status
Not open for further replies.

mlhughes0522

Train Attendant
Joined
Mar 9, 2014
Messages
73
Heads up amtrak 98 MIA 938A Departed: 1 hour, 18 minutes late. Right now is 1hr 30mins late

All I say is wow what happen
 
Intranet pages say that the lead engine was inoperative, and needed to be removed. Sure enough, checking the consist it's been sent out with one P42 instead of the usual two.
 
Will it make the entire trip with just one P42, or will it pick up a second somewhere along the way?
 
Often, an engine is added at Sanford when this happens.
 
Status
Not open for further replies.
Back
Top