battalion51
Engineer
I've just been informed that CSX Computers nationwide are shut down. What does that mean, everything is stopped where it is, no train is moving on the CSX system. Aprroximate locations of equipment:
P05215-Yukon, FL
P09114-Benson Jct, FL
P09215-Benson Jct, FL
P09714-Deland, FL
P09815-Ogeechee, GA
All trains are stopped, dispatchers are calling all trains for location check. The computer went down at approx. 17:45 EDT, with most trains coming to a stop at about 18:00 EDT when lined signals ran out for that train. No train will move until the computer system is back up. This does effect all trains on CSX territory from Miami to Chicago and everywhere in between on the 22,000 mile CSX system. I'll update once I recieve more info.
P05215-Yukon, FL
P09114-Benson Jct, FL
P09215-Benson Jct, FL
P09714-Deland, FL
P09815-Ogeechee, GA
All trains are stopped, dispatchers are calling all trains for location check. The computer went down at approx. 17:45 EDT, with most trains coming to a stop at about 18:00 EDT when lined signals ran out for that train. No train will move until the computer system is back up. This does effect all trains on CSX territory from Miami to Chicago and everywhere in between on the 22,000 mile CSX system. I'll update once I recieve more info.