Superliner
Train Attendant
- Joined
- Aug 27, 2003
- Messages
- 57
From which train does the equipment come from used on the California Zephyr out of Chicago? The Capitol Limited?
Superliner, my understanding is that the Capitol Ltd becomes the SW Chief. I dunno the runthru for the CZ, though.Superliner said:Upon further investigation, the Capitol Limited was late arriving into Chicago that same day close to 4 hours.
The Southwest Chief/Capitol Limited run through was annuled at the beggining of the summer. This was due in part that there was less than two hours between arrival and departure eastbound, and that was only if the Cheif was on-time. Well, the Southwest Chief wasn't arriving on-time most of the time, up to 2 hours late was becoming the norm. This in turn put the Capitol Limited departing 2-3 hours late, arriving into Washington up to 4 hours late!The Chief said:Superliner, my understanding is that the Capitol Ltd becomes the SW Chief. I dunno the runthru for the CZ, though.Superliner said:Upon further investigation, the Capitol Limited was late arriving into Chicago that same day close to 4 hours.
Jon, I was speaking of the WestBound runthru, which was what Superliner was asking about. I dunno about the EB. And they may have changed the WB. My info on that is from the second week of July 2003.Amfleet said:due in part that there was less than two hours between arrival and departure eastbound,
Enter your email address to join: