Z zephyr17 Engineer AU Supporting Member Joined Jul 23, 2009 Messages 8,015 Location Washington State Sep 19, 2017 #26 Padding and fairly slow trackage.
Bob Dylan 50+ Year Amtrak Rider AU Supporting Member Joined May 31, 2009 Messages 26,402 Location Austin Texas Sep 19, 2017 #27 Also the bridge over the River is a major bottleneck between Vancouver and Portland, with a major rail junction right by the Vancouver Station and the approach to the bridge. ( Freight and Passenger traffic)
Also the bridge over the River is a major bottleneck between Vancouver and Portland, with a major rail junction right by the Vancouver Station and the approach to the bridge. ( Freight and Passenger traffic)
M Metra Electric Rider Engineer Joined Mar 10, 2016 Messages 2,089 Sep 20, 2017 #28 Thanks for the answers!