I think it is quite possible to add at least one more platform with two platform tracks at Target Field to make it a total of 4 platform tracks. They could arrange to run a shuttle from SPUD to Target Field and us SPUD as the major terminal at least coming from the south and east. OTOH, even SPUD can probably get at most another two platform tracks given that the north side of the track area has been repurposed into a bus stand and parking lot.
The OTOL Rail Fest groups visited both SPUD and Target Field stations and took trains from both just a few weeks back.