A abqdave Train Attendant Joined Mar 18, 2008 Messages 96 Location Albuquerque, NM Oct 9, 2009 #1 NM Rail Runner will finish installing CTC by the end of this month http://www.progressiverailroading.com/news...le.asp?id=21696
NM Rail Runner will finish installing CTC by the end of this month http://www.progressiverailroading.com/news...le.asp?id=21696
G gswager Engineer AU Supporting Member Joined Aug 23, 2002 Messages 2,973 Location southern Idaho Oct 10, 2009 #2 Is that where the old semaphore located?
VentureForth Engineer Joined Jan 23, 2007 Messages 6,441 Location West Melbourne, FL Oct 28, 2009 #3 Yes. If I recall correctly, there were two in that stretch. They said they didn't work, but I've watched them change. Sigh. FWIW, some of the smoothest segmented track I've ever ridden.
Yes. If I recall correctly, there were two in that stretch. They said they didn't work, but I've watched them change. Sigh. FWIW, some of the smoothest segmented track I've ever ridden.