battalion51
Engineer
I'm hearing rumors from mid-level managment that there could be a possible extension of the Super Train beyond it's June 23 expiration date. The reason for the extension is not because of Nahunta SD trackwork, but rather on the Miami Sub. Right now it looks like there will be a 1000-1500 and 2200-0500 curfew in effect so that the jerks at Herzog can catch up on their Construction deadlines. Nothing for sure at this point, but keep your ear close to the wall for whispering.