Those costs make more sense. As for the Wisconsin Talgos, they are going to come up in these railroad forums every time there is a question about getting rolling stock for a service. Despite the rather significant issue of arranging for a service facility. Perhaps someone should make a railfan t-shirt that says "Free the Wisconsin Talgos!"You missed a zero. It was $750K. The $1.4M is net of purchase price and refurb AFAIU.
There are those two Talgos going abegging in Wisconsin, no?
On a somewhat more serious idea, if Illinois Democratic leaders want to poke WI Gov. Walker in the ribs a little, IL DOT could team with WA to either buy or lease the 2 Talgo trainsets from Talgo once the legal disputes between Talgo and WI are resolved. IL would lease the Talgo trainsets for the Black Hawk service and run them until mid 2017 when most of the new bi-levels should have been delivered. Arrange for Amtrak to provide space for servicing the Talgos in Chicago. Then the Talgos are transferred to WA in 2017 to expand Cascades service upon the completion of all the HSIPR project. WA gets the 2 sets under a lease with Talgo with an option to buy arrangement. See, problem solved!