I believe it is being considered...Notwithstanding that they could still operate a Sleeper on the Boston - Washington DC segment. Afterall they have to change engines in Washington DC anyway. They could just remove/add the Sleeper with the electric motor at Washington DC, if they wanted to run an overnight Sleeper on the NEC and the wherewithal to do so.
Enter your email address to join: