Orlando Sentinel article November 21, 2019. Discusses the construction that has begun at the Orlando end, and plans, which include connections to SunRail and Disney, but with no details as to how they intend to make those connections. Estimated fare ORL-MIA of $60-$100 one-way. They are building a $70 Million Vehicle Maintenance Facility just South of Orlando International Airport. 62 Acres, 6 miles of track, 139,000 square foot building. It will include a train wash, utilizing 1,000 gallons per train and recycling 80% of it. The maintenance facility will be 1,000 feet long. Each train will have two engines and 10 cars,15' height, a 1,300-foot consist. They will be operating 10 equipment sets, with 7 kept at Orlando overnight. Link: https://www.orlandosentinel.com/new...0191121-idmqsc3zgrgk7espcuqypunbca-story.html