I was just wondering if anyone has an update on the new Viewliners that Amtrak ordered from CAF. Has production been started? Are the designs the same as projected or were any last minute changes made? Have the toilets and sinks been deleted from the roomettes?
A while back we had either a CAF employee or someone who had the inside track on what was happening in that facility on this forum. If he/she reads this perhaps we can satisfy our curiousity.
A while back we had either a CAF employee or someone who had the inside track on what was happening in that facility on this forum. If he/she reads this perhaps we can satisfy our curiousity.